Question 1
Carlow Ltd makes product T. Each unit requires 4 kg of material at $3.50 per kg and 2.5 direct labour hours at $12.00 per hour. Variable overhead is $4.00 per direct labour hour. Budgeted fixed production overhead is $360,000 and budgeted output is 24,000 units. Fixed overhead is absorbed on a direct labour hour basis. What is the standard full production cost of one unit of T under absorption costing?
- A $69.00
- B $54.00
- C $60.00
- D $63.00
Show the answer
Answer: A. - Budgeted labour hours = 24,000 × 2.5 = 60,000; fixed OAR = $360,000 / 60,000 = $6.00 per hour
| Standard cost card | $ |
|---|---|
| Direct materials (4 kg × $3.50) | 14.00 |
| Direct labour (2.5 hrs × $12.00) | 30.00 |
| Variable overhead (2.5 hrs × $4.00) | 10.00 |
| Standard marginal cost | 54.00 |
| Fixed overhead (2.5 hrs × $6.00) | 15.00 |
| Standard absorption cost | 69.00 |
Question 2
The standard material cost of product G at Dunmore Ltd is 3 kg at $6.00 per kg. In March, 5,200 units of G were produced. 16,400 kg of material were bought and used, at a total cost of $95,120. What were the material price and usage variances for March?
- A Price $3,280 favourable; usage $4,640 adverse
- B Price $3,120 favourable; usage $4,800 adverse
- C Price $3,280 adverse; usage $4,800 favourable
- D Price $3,280 favourable; usage $4,800 adverse
Show the answer
Answer: D. - Actual price per kg = $95,120 / 16,400 = $5.80
- Price variance = (standard price − actual price) × actual quantity = ($6.00 − $5.80) × 16,400 = $3,280 F
- Standard quantity for actual output = 5,200 × 3 = 15,600 kg
- Usage variance = (standard quantity − actual quantity) × standard price = (15,600 − 16,400) × $6.00 = $4,800 A
Total material variance = $93,600 − $95,120 = $1,520 A, which equals the two variances combined. Cheaper material may have been of lower quality, causing the higher usage.
Question 3
Fordham Ltd uses standard absorption costing. Budgeted fixed production overhead is $240,000 and budgeted output is 12,000 units, each taking 2 standard labour hours. Fixed overhead is absorbed per labour hour. Actual output was 11,400 units, actual hours worked were 24,600 and actual fixed overhead was $246,000. What were the fixed overhead capacity and efficiency variances?
- A Capacity $6,000 adverse; efficiency $18,000 favourable
- B Capacity $6,000 favourable; efficiency $12,000 adverse
- C Capacity $6,000 adverse; efficiency $18,000 adverse
- D Capacity $6,000 favourable; efficiency $18,000 adverse
Show the answer
Answer: D. - Budgeted hours = 12,000 × 2 = 24,000; OAR = $240,000 / 24,000 = $10.00 per hour
- Standard hours for actual output = 11,400 × 2 = 22,800
| Variance | Calculation | $ |
|---|---|---|
| Expenditure | 240,000 − 246,000 | 6,000 A |
| Capacity | (24,600 − 24,000) × 10.00 | 6,000 F |
| Efficiency | (22,800 − 24,600) × 10.00 | 18,000 A |
| Volume (capacity + efficiency) | (11,400 − 12,000) × 2 × 10.00 | 12,000 A |
The workforce worked more hours than budgeted (favourable capacity) but took longer than standard to make the actual output (adverse efficiency).
Question 4
Glenfield Ltd uses standard marginal costing. Budgeted sales of product V were 8,000 units at a standard selling price of $45.00. The standard variable cost is $27.00 per unit and the standard fixed production cost is $8.00 per unit. Actual sales were 8,600 units at $43.50 each. What were the sales price variance and the sales volume contribution variance?
- A Price $12,900 adverse; volume $10,800 favourable
- B Price $12,900 adverse; volume $6,000 favourable
- C Price $12,000 adverse; volume $10,800 favourable
- D Price $12,900 adverse; volume $27,000 favourable
Show the answer
Answer: A. - Sales price variance = (actual price − standard price) × actual units = ($43.50 − $45.00) × 8,600 = $12,900 A
- Standard contribution per unit = $45.00 − $27.00 = $18.00
- Sales volume contribution variance = (actual units − budgeted units) × standard contribution = (8,600 − 8,000) × $18.00 = $10,800 F
Under absorption costing the volume variance would be valued at standard profit of $10.00, giving $6,000 F. The price cut may have helped generate the extra volume.
Question 5
Quenby Ltd uses standard absorption costing and absorbs fixed production overhead on a per-unit basis. Budgeted fixed overhead was $180,000 and budgeted output 9,000 units. Actual output was 9,450 units and actual fixed overhead was $186,300. What were the fixed overhead expenditure and volume variances?
- A Expenditure $6,300 adverse; volume $9,000 favourable
- B Expenditure $6,300 favourable; volume $9,000 adverse
- C Expenditure $2,700 favourable; volume $9,000 favourable
- D Expenditure $6,300 adverse; volume $8,871 favourable
Show the answer
Answer: A. Standard absorption rate = 180,000 / 9,000 = $20 per unit.
- Expenditure variance = budgeted 180,000 − actual 186,300 = $6,300 A
- Volume variance = (actual output 9,450 − budgeted output 9,000) × $20 = $9,000 F
Check: overhead absorbed 9,450 × $20 = $189,000 − actual $186,300 = $2,700 over-absorbed (F) = $6,300 A + $9,000 F.
Question 6
Strand Fabrications uses standard absorption costing and absorbs fixed production overhead per machine hour. Budgeted fixed overhead was $312,000 and budgeted output was 13,000 units, each with a standard time of 1.5 machine hours. Actual output was 12,600 units, 20,100 machine hours were worked and actual fixed overhead was $309,500. What were the fixed overhead capacity and efficiency variances?
- A Capacity $9,600 adverse; efficiency $19,200 adverse
- B Capacity $9,600 favourable; efficiency $9,600 adverse
- C Capacity $9,600 favourable; efficiency $28,800 adverse
- D Capacity $9,600 favourable; efficiency $19,200 adverse
Show the answer
Answer: D. - Budgeted machine hours = 13,000 x 1.5 = 19,500; absorption rate = $312,000 / 19,500 = $16 per machine hour
- Standard hours for actual output = 12,600 x 1.5 = 18,900
| Variance | Calculation | $ |
|---|---|---|
| Capacity | (actual hours 20,100 - budgeted hours 19,500) x $16 | 9,600 F |
| Efficiency | (standard hours 18,900 - actual hours 20,100) x $16 | 19,200 A |
| Volume | (12,600 - 13,000) units x $24 | 9,600 A |
The capacity and efficiency variances add up to the volume variance. (The expenditure variance, $312,000 - $309,500 = $2,500 F, is separate.)
Keep practising Standard costing
Sign up free to practise this syllabus area in full, sit timed ACCA MA mocks and see your score by area. Every question on Fincora is written by us; none are past exam papers.
More ACCA MA syllabus areas
Practice questions are for study only and are not official exam questions. Back to ACCA MA mock exams and practice.